On this project, the objective was to bury 2000 feet of 2 inch SDR-11 PollyPipe which ran to a 5000-gallon tank on top of the mountain. This was a remote site install requiring a generator that would run when the tank float with a call for water to refill the tank. All of the cattle troughs were gravity fed from the 5000-gallon holding tank.


